MODERNIZATION OF TASHKENT TPP, COMPARISON OF STEAM TURBINE UNIT WITH STEAM - GAS UNITS

Authors

  • SAMATOVA SHOIRA YULDASHEVNA Karshi Engineering and Economics Institute Associate Professor of the Department "Heat power engineering"
  • SHODIEV BOBIR TOYIR UGLI Uzbekistan, Assistant of the Department "Electric Power Engineering"
  • JURAEV SHUXRAT ABDUJABBOR UGLI Uzbekistan, Undergraduates: Department of "Heat power engineering"
  • SAIDOV ULMASJON TOSHKENTOVICH Uzbekistan, Undergraduates: Department of "Heat power engineering"

Keywords:

Installed capacity utilization factor, number of hours of use of installed capacity, working time coefficient

Abstract

The environmental assessment carried out showed that the commissioning of the CCGT at TashTEP will lead to a reduction in the anthropogenic load on the environment.

Downloads

Published

2022-02-27

How to Cite

SAMATOVA SHOIRA YULDASHEVNA, SHODIEV BOBIR TOYIR UGLI, JURAEV SHUXRAT ABDUJABBOR UGLI, & SAIDOV ULMASJON TOSHKENTOVICH. (2022). MODERNIZATION OF TASHKENT TPP, COMPARISON OF STEAM TURBINE UNIT WITH STEAM - GAS UNITS. Next Scientists Conferences, 1(01), 32–42. Retrieved from https://nextscientists.com/index.php/science-conf/article/view/38

Most read articles by the same author(s)